Year | Client | End User | Segment | Project Name | Plant Capacity | Project Location and Country | OILTECH Scope of work |
2010 | IPLOM | IPLOM | REFINERY | Oil Storage Tanks new pumping system | 150 m3/h | Busalla Refinery - Italy | Process Design of the new pumping and oil transfer lines. |
2010 | SIIRTEC NIGI | ENI | ONSHORE | Zubair Oil & Gas Field | 824 MMSCFD / 33,000 bopd | Zubair - Iraq | FEED preparation for new Oil & Gas Treatment Plant |
2010 | SIIRTEC NIGI | ENEL POWER | POWER | Ammogen | 900 Kg/h NH3 | Torrevaldaliga - Italy | Plant Start Up Services |
2010 | SIIRTEC NIGI | GAZPROM | ONSHORE | Portovaya GTP | 170 MMSCMD | Russia | 3D Model review – Hazop Analysis – Operating Manual |
2010 | TECHINT | KJO | ONSHORE | Al Khafji Joint Operations – Hout Crude Facilities | 100,000 bopd | Saudi Arabia | Process Design Oil of an oil treatment plant |
2010 | TECHINT | ENI | ONSHORE | Val D’Agri Oil & Gas Plant - Debottlenecking Project | Val D’Agri - Italy | TEG Dehydration & Amine Sweetening Units Revamping – Flare system debottlenecking | |
2010 | TECHINT | ENERGOPROJEKT-WARSZAWA | POWER | OPOLE POWER PLANT | 2 x 890 MW | Opole - Polland | Process Design of Water Treatment Unit for Power Boiler Feed. Process Design of Water Cooling System. |
2010 | FESTINA LENTE | RASHPETCO | ONSHORE | Rossetta Gas Field Upgrade Project | 6,000 bopd | Egypt | Process Sizing of Three Phase Separator |
2010 | FESTINA LENTE | KHALDA PETROLEUM Co. | ONSHORE | Kalabsha 40000 BOPD Oil Facilities Project | 40,000 bopd | Egypt | Process Sizing of Three Phase Separator |
2010 | FESTINA LENTE | PHARAONIC PETROLEUM Co. | ONSHORE | Pharaoninc Petroleum Company - West Harbor Expansion Project | 443 MMSCFD | Western Desert - Egypt | Basic Design of the Units including Cathodic Protection Design. HAZOP Review. |
2010 | BASSI | IN SALAH GAS | ONSHORE | In Salah Southern Field Project | 500 MMSCFD - 250 m3 slug capacity | In Salah Onshore - Algeria | Process Design and Calculation Report for a Finger Type Slug Catcher |
2010 | BASSI | CHEVRON | ONSHORE | Wheatstone LNG Plant Project | 2500 m3 Slug Capacity | Australia | Process Design and Calculation Report for a Finger Type Slug Catcher |
2010 | TECHINT | ENI Congo | ONSHORE | M’Boundi Oil & Gas Treatment Plant | 3 MMSCMD | Congo | TEG Dehydration & Regeneration Process design |
2010 | AUSY | ENI | REFINERY | Heavy Oil transfer line to storage tank | 170 m3/h | Sannazzaro Refinery - Italy | Pressure drop calculation and Pump selection |
2010 | BELLELLI | BAKHTAR PETROCHEMICAL Co. | ONSHORE | DONOR Drying Package | 1 m3/h | Iran | Process calculation for molecular sieve drying package |
2010 | SIIRTEC NIGI | BP | ONSHORE | West of Shetland FPSO Project | 6. MMSCMD | North Sea- UK | TEG Dehydration and Regeneration Units Process Design |
2010 | SIIRTEC NIGI | ENEL POWER | POWER | Ammogen | 900 Kg/h NH3 | Torrevaldaliga - Italy | Revamping of existing heating steam and desuperheating system. |
2011 | IMS | QATAR PETROLEUM | ONSHORE | Acid Gas Removal - Dukhan Onshore Plant | 9.5 MMSCMD | Dukhan - Qatar | Process Design of the new Gas Dehydration and TEG Regeneration Plant |
2011 | IMS | PETROBEL | ONSHORE | New Denise Slug Catcher - Onshore | 8 MMSCMD | El Gamil Plant - Egypt | Process Calculation of safety system. Safety Valves and depressurization design. |
2011 | IMS | ADCO | ONSHORE | Qusahwira Full Field Development | 0.9 MMSCMD | Abu Dhabi - UAE | Process Calculation for TEG Contactor Blow Down system |
2011 | DG IMPIANTI | ENI Congo | ONSHORE | Litchendjili Onshore Oil & Gas Treatment Plant | 2. MMSCMD + 750 Sm3/d oil | Congo | Basic Design of new Oil & Gas treatment plant |
2011 | JACOBS | ENI | REFINERY | Vacuum Tower overhead cooling system Debottlenecking | 9.6 MW | Sannazzaro Refinery - Italy | Feasibility study for replacement of existing cooling water overhead condensers |
2011 | JACOBS | ENI | REFINERY | Crude Oil Storage & Transfer System | 1,900. m3/h | Taranto Refinery - Italy | FEED preparation for the debottlenecking and optimization project of the existing crude oil storage and transfer system |
2011 | AUSY | POLIMERI EUROPA | REFINERY | Butene Unloading Facilities | 20 m3/h | Porto Marghera - Italy | Feasibility Study, machinery specification and selection. |
2011 | AUSY | ENI | REFINERY | Isostripper Tower Feed Preheater | 1.2 MMkcal/h | Sannazzaro Refinery - Italy | Feasibility Study for Modification of existing control logic philosophy |
2011 | REPCO | EDISON | ONSHORE | Centrale di Collalto | 10 MMSCMD | Collalto - Italy | Dehydration and TEG Regeneration Units – Training Course |
2011 | AUSY | ENI | REFINERY | Vacuum Tower Bottom Product Cooling System | 22 MMBtu/h | Sannazzaro Refinery - Italy | Feasibility Study for replacement of existing air cooler |
2011 | AUSY | ENI | REFINERY | Visbreaker bottom product transfer line to storage tank | 80 m3/h | Sannazzaro Refinery - Italy | Feasibility Study for new transfer line and steam tracing system |
2011 | JACOBS | POLIMERI EUROPA | REFINERY | Vapour Recovery Unit | 1,500. Nm3/h | Sarroch Refinery - Italy | Basic design for a cryogenic Vapour Recovery Unit. |
2011 | BASSI | IN SALAH GAS | ONSHORE | In Salah CPF | 15 MMSCMD - 250 m3 slug capacity | In Salah Onshore - Algeria | Finger type Slug Catcher – Process Design and calculation report |
2011 | SIIRTEC NIGI | NEXEN Petroleum | OFFSHORE | “Golden Eagle” Platform | 42 MMSCMD | North Sea - UK | Basic design of Gas Dehydration & TEG Regeneration Unit |
2011 | SIIRTEC NIGI | SAIPEM | ONSHORE | B405B – Central Area Field Complex | 123. MMSCMD | Sonatrach - Algeria | Process design of Gas Dehydration & TEG Regeneration Unit |
2011 | JACOBS | LILLY | PHARMA | Water Injection & Purified Water Generation Packages | Sesto Fiorentino - Italy | Basic Process Design | |
2011 | JACOBS | ARGOR HERAEUS | INDUSTRIAL | Technical and Process Utilities Section | Llay Lay (Cile) | Basic Design | |
2012 | MARIS | GASPLUS | ONSHORE | Poggiofiorito Stoccaggio | 2 MMSCMD | Fornovo - Italy | Feasibility Study for new gas storage, compression and dehydration (by molecular sieve) plant |
2012 | MARIS | GASPLUS | ONSHORE | San Benedetto Stoccaggio | 6.5 MMSCMD | Fornovo - Italy | Feasibility Study for new gas storage, compression and dehydration (by molecular sieve) plant |
2012 | BASIS | EDISON | OFFSHORE | NAQ / PII Platform Debottlenecking | 40 MMSCFD | Abuqir Field - Egypt | Abuqir Field Development – Existing NAQ/PII Platform Revamping – New Wells Exploitation |
2012 | BASIS | EDISON | OFFSHORE | NAQ / PIII Platform Debottlenecking | 165 MMSCFD Gas + 1,500 bopd | Abuqir Field - Egypt | Abuqir Field Development – New NAQ/PIII Platform – Feasibility Study |
2012 | BASIS | EDISON | OFFSHORE | NAQ / PII Platform Debottlenecking | 165 MMSCFD Gas + 1,500 bopd | Abuqir Field - Egypt | Abuqir Field Development – New NAQ/PIII Platform – FEED Development |
2012 | REPCO | EDISON | ONSHORE | Centrale di San Potito | 10 MMSCMD | San Potito - Italy | Dehydration and TEG Regeneration Units – Operating Manual |
2012 | REPCO | EDISON | ONSHORE | Centrale di San Potito | 10 MMSCMD | San Potito - Italy | DEG Regeneration Unit – Operating Manual |
2012 | REPCO | ENI Congo | ONSHORE | M’Boundi Gas Treatment Plant | 3.2 MMSCMD | Congo | Dehydration and TEG Regeneration Units – Basic Design – Process calculation report |
2012 | REPCO | ENI Congo | ONSHORE | M’Boundi Gas Treatment Plant | 3.2 MMSCMD | Congo | Dehydration and TEG Regeneration Units – Operating Manual |
2012 | REPCO | ENI Congo | ONSHORE | M’Boundi Gas Treatment Plant | 3.2 MMSCMD | Congo | Fuel Gas Package – Basic Design |
2012 | BASSI | JKC | ONSHORE | Ichthys Onshore LGN Facilities | 45 MMSCMD - 360 m3 slug capacity | Ichthys - Australia | Finger type Slug Catcher – Process Design and calculation report |
2012 | SIIRTEC NIGI | NEXEN PETROLEUM | OFFSHORE | “Golden Eagle” Platform | 42 MMSCMD | North Sea - UK | Detailed design of Gas Dehydration & TEG Regeneration Unit |
2012 | AUSY | ENI | REFINERY | Truck Loading Vapour Recovery System | Porto Marghera - Italy | Process Verification of vapour recovery network - Noise reduction study. | |
2012 | GESTALD | KHALDA PETROLEUM Co. | ONSHORE | Three Phase Production Separator | 20,000 BOD | Egypt | Separator Process Design |
2012 | GESTALD | MICOPERI | INDUSTRIAL | Air Compressor Package | 14,000 Nm3/h | Italy | Process Calculation & Design of Air compression system for Costa Concordia wreck removal by sponson pressurization |
2012 | JACOBS | LILLY | PHARMA | Sterilized Water Production | Italy | Process Calculation for Water treatment by Reverse Osmosis and Ultrafiltration Units | |
2012 | TECNIMONT | BRASKEM IDESA | PETROCHEM | LDPE Production Unit | 300,000 tons/y | Mexico | Process Design of a new LDPE plant |
2012 | BALLESTRA | CHEMICAL | Sulphuric Acid Production Plant | India | FEED ENDORSEMENT | ||
2012 | BALLESTRA | CHEMICAL | Ethoxilates | Basic Process Design | |||
2013 | BALLESTRA | CHEMICAL | New Sulphonation Plant | FEED | |||
2013 | MARIS | SOCIETA' PADANA ENERGIA | ONSHORE | Fornovo - Italy | Detailed Engineering for a New WellHeads Field and Gas Treatment Plant | ||
2013 | JACOBS | ENI SYNDIAL | REFINERY | Industrial Water Treatment Plant | 500 m3/h | Viggiano - Italy | Process Basic. including: Organic solvent stripping unit, Heavy metal oxidation unit, Sludge treatment section, waste vapor incinerator |
2013 | SICON OIL & GAS | GASCO | ONSHORE | Gas / Condensate Pipeline | UAE | Flow Assurance – OLGA Simulation | |
2013 | JACOBS | ROCKWOOD | CHEMICAL | New Ferrous Pigments Production Plant | Basic Process Design | ||
2013 | JACOBS | TAPI TEVA | PHARMA | SM2 Synthesis – New Bulk Pharmaceutical Plant for API | Savsky Marof - Croatia | FEED | |
2013 | BALLESTRA | CHEMICAL | Roan Tailings Reclamation Project | 900 tons/day H2SO4 & 100 tons/day Liquid SO2 | Congo | Process design activities for EPC | |
2013 | BALLESTRA | CHEMICAL | PUMA Project | 100 tons/day Sulphuric Acid | Niger | Process design activities for EPC | |
2013 | MARIS | ENI Congo | OFFSHORE | MARINE XII BLOCK – Litchendjili Gas Development | Congo | Process activities for EPC | |
2013 | TECNIMONT | ENI | PETROCHEM | ETBE / MTBE Units Revamping | Ravenna Refinery - Italy | Process activities for EPC | |
2013 | JACOBS | PDVSA | REFINERY | New Gasoil Refinery | Venezuela | Basic Design & FEED – Amine Sweetening, SRU, Tail Gas Treatment, Sour Water Stripper Units | |
2013 | PEG | DNO | ONSHORE | Natural Gas Treatment Plant | Kurdistan | Gas Amine Sweetening Unit and Glycol Dehydration Unit – Basic Design | |
2013 | TECNIMONT | OCI | PETROCHEM | New Fertilizer Complex | Iowa - USA | Utility System Design | |
2013 | MARIS | ENI | OFFSHORE | ANNABELLA Platform | Adriatic Sea - Italy | Oily water treatment; Production Separator, Air Instrument; Blow down system; Fuel Gas Packages | |
2013 | JACOBS | ENI SYNDIAL | REFINERY | Groundwater Treatment Unit | Assemini - Italy | Basic Process Designfor: Organic solvent stripping unit, Heavy metal oxidation unit, Sludge treatment section, waste vapor incinerator | |
2013 | JACOBS | HUNTSMANN | CHEMICAL | Tioxide Unit Flue Gas Treatment System Revamping | Scarlino - Italy | Feasibility Study. Comparison of different technologies for SOx abatement | |
2013 | JACOBS | ENI VERSALIS | PETROCHEM | New C4 stream Hydrogenation Unit | Brindisi Plant - Italy | FEED | |
2013 | PUMA PROGETTI | APENNINE | ONSHORE | Gas Dehydration Unit | Casa Tiberi - Italy | Basic of a Gas Dehydration Unit by Molecular Sieve Adsorption | |
2013 | PUMA PROGETTI | ONSHORE | Gas Sweetening and Hg Removal Units | Kazakhstan | Feasibility Study | ||
2013 | PUMA PROGETTI | DORIS INTERNATIONAL | INDUSTRIAL | New Melt PET Transfer Line | India | Pressure drop calculation and line sizing | |
2013 | PUMA PROGETTI | NORTHSUN | ONSHORE | Pozzi Ravizza e Bagnolo in Piano Revamping | Reggio Emilia - Italy | Feasibility study for Well Heads, gas/oil separation, transfer line and ancillary equipment development | |
2014 | REPCO | B.H.E.L. | POWER | MARIB PHASE II – Fuel Oil Treatment Unit | 600 m3/h | Safir - Yemen | Process activities for EPC |
2014 | SIIRTEC NIGI | ZHAIKMUNAI | ONSHORE | GTU-3 – NEW GAS / CONDENSATE TREATMENT UNIT | 6. MMSCMD of gas and 11,000 m3/d of condensate | Uralsk - Kazhakistan | Basic design of a complete Oil & Gas Treatment Plant, including inlet slug catcher, oil/gas separation, condensate stabilization, gas dehydration (molecular sieve), gas amine sweetening, turbo-expander, light condensate cold fractionation (de-methanizer, de-ethanizer, debutanizer), LPG Recovery, LPG Storage, LPG loading & Unloading facilities |
2014 | SIIRTEC NIGI | SOC | ONSHORE | NEW GAS COMPRESSION STATION | 240 MMSCFD | Zubair - Iraq | Process Basic Design |
2014 | SIIRTEC NIGI | LUKOIL | ONSHORE | Glycol Gas Dehydration Unit | 0.36 MMNMCD | Perm - Russia | Process Basic Design |
2014 | SIIRTEC NIGI | LUKOIL | ONSHORE | Glycol Gas Dehydration Unit | 1.3 MMNMCD | Perm - Russia | Process Basic Design |
2014 | PUMA PROGETTI | ENI | OFFSHORE | Prezioso Platform - New Gas Compression and Gas Dehydration Units | 250 MMSCFD | Iran | Basic and Detailed Engineering development |
2014 | BASSI | ONSHORE | New Finger Type Slug Catcher | 24 MMNMCD | Muscat - Oman | Equipment Sizing and Process Design | |
2014 | FOSTER WHEELER | ENI VERSALIS | REFINERY | Aromatic unit - C9+ Stream Upgrading | Priolo (SR) - Italy | PIDs, Tie-in list, Consumption list, Equipment list, Line list | |
2014 | FOSTER WHEELER | BIOGEN | PHARMA | Project Biogen Idec | Hillerφd - Denmark | FAT activities in Austria (Llinz and Gratz): Mechanical check and management open point Punch list; Data sheet, PIDs, Line Sizing, PSV, Pump, Material Requisition, Line list, Tie-in list, Valve list, PFDs Project Biogen Idec is a multipurpose plant for the production of therapeutic proteins from mammalian cell culture processes | |
2014 | JACOBS | SARAS | REFINERY | Revamping of Sarroch Refinery | Cagliari - Italy | PSV calculation of existing equipment after revamping, PSV for new equipment | |
2014 | TECNIMONT | TOTAL | ONSHORE | Tempa Rossa Project Development | Potenza - Italy | Unit developed: Flare K.O.Drum ,Closed Drain, Open Drain,Vapour Recovery Unit | |
2014 | FOSTER WHEELER | TOTAL | REFINERY | Anwerup Project (Antwerp Refinery Upgrade) | Belgium | PID management, Hazop Reccomandation follw-up, Line List and Tie-in List management | |
2015 | SIMECO | SONATRACH | ONSHORE | New wells and relevant gathering system | 750. MMSCFD of gas and 1,000. tons/h of oil | Hassi Messaoud - Algeria | PIDs, Process simulation, Heat material balance, Equipment design, Technical documentation |
2015 | CS IMPIANTI | ENI Algeria / SONATRACH | ONSHORE | Menzel Ledjmet East Project. | Menzel Ledjmet East - Algeria | 16 new wells and relevant gathering system. Basic Process Design of Wellhead Network, Process simulations, Heat and Material Balance, P&ID, PFD, Test Separator Verification.- Operating Manual | |
2015 | JACOBS | BOLTON ALIMENTARI | INDUSTRIAL | KADIMA 1 : Steam Accumulator for Autoclaves. | Cermenate (CO) - Italy | Steam Accumulator Calculations, Condensate Storage System Calculation (Storage Tank + Pump), P&ID, Line Size, Control Narrative. | |
2015 | JACOBS | HELSINN ADVANCED SYNTHESIS | PHARMA | Vent System and process treatments in Centrale | Biasca - Svizzera | Exauste Gas Discharge Layout, Line Size Calculation. | |
2015 | JACOBS | NOVARTIS | PHARMA | New Milling and Blending Center | Stain - Svizzera | Equipment Sizing and Design Criteria Analysis, Building Arrangement, Equipment Consumption. | |
2015 | JACOBS | SANOFI AVENTIS | PHARMA | SANOFI JEWEL | Anagni - Italy | Process Description | |
2015 | PUMA PROGETTI | APENNINE | ONSHORE | Casa Tonetto - Gas Dehydration Unit | Nervesa della Battaglia (TV) - Italy | Process Design, PFD, P&ID, Heat & Material Balances – Equipment and line sizing - Depressurization system, PSVs | |
2015 | SIME | MAERSK OIL KAZAKHSTAN | ONSHORE | Dunga Field Development Phase II - Booster/Inlet Compressor Units | 18,000 bopd | Dunga Field - Kazakhstan | Bid preparation for Vapour Recovery Package; Bid preparation for Flash Gas Booster Compressor and Inlet Compressor Package; Bid preparation for Produced Water Treatment Package. |
2015 | FIORENTINI | ADCO | ONSHORE | ALDABB’IYA PLANT – Gas Dehydration & Glycol Regeneration Unit | 227 MMSCFD of Wet Gas | Abu Dhabi - UAE | Bid Preparation – PFD – H&MB – Equipment Sizing – Line sizing – Utilities Consumption – P&ID Review |
2015 | FESTINA LENTE | KHALDA PETROLEUM Co. | ONSHORE | AG and SAG Oil & Gas Field - New Separators Interconnecting Project | Egypt | Equipment and Line Sizing – PSV and Blow Down System – PFD – H&MB - P&ID | |
2015 | CS IMPIANTI | ENI Congo | ONSHORE | Litchendjili On Shore Plant – Produced Water Treatment Plant | Congo | Operating & Maintenance Manual | |
2015 | CS IMPIANTI | ENI Congo | ONSHORE | Litchendjili On Shore Plant – Sanitary Water Treatment Plant | Congo | Operating & Maintenance Manual | |
2015 | BASSI | BP | ONSHORE | Tangguh Expansion Project – New Finger Type Slug Catcher | Bintuni Bay - Indonesia | Slug Catcher Sizing | |
2015 | DG IMPIANTI | ENI E&P | OFFSHORE | Loango Further Development Project | 125 tons/h of treated oil | Loango - Congo | Basic Design including HAZOP review |
2015 | JACOBS | ENI VERSALIS | POWER | New Steam Generators | 60 tons/h of steam | Porto Marghera - Italy | FEED (H&MB, PFD's, P&I's, Equipment Spec.'s) |
2015 | JACOBS | ELANCO | PHARMA | CHEWIES PROJECT | Huningue, France | Process design and project engineering services. | |
2015 | AUSY | ENI VERSALIS | PETROCHEM | NEW PROPYLENE CONDENSATION SYSTEM | Porto Marghera - Italy | Process Design. | |
2015 | AUSY | ENI VERSALIS | PETROCHEM | Boil-off Compressors install. | Porto Marghera - Italy | Process Design Basis -Tecnical Bid evaluation CR4 - PACKAGE ETHYLENE BOIL-OFF RECIPROCATING COMPRESSOR | |
2015 | SIIRTEC NIGI | TPOC | ONSHORE | Mansuriya Gas Field | Iraq | FEED Endorsment. Review of the utility units (Flare Systems, Fuel Gas System, Cooling Water System, Chemical Injection System). FEED FOR MANSURIYA GAS FIELD 100MMSCFD MOLAR SURFACE FACILITIES | |
2015 | SIIRTEC NIGI | ADCO | ONSHORE | EPC FOR AL DABB'IYA SURFACE FACILITIES - PHASE III | 383 MMSCFD TEG circulation: 32,5 m3/h | PIDs, PFD, Line List, Equipment calculation & Data Sheet, Valves & Instrument Data Sheet, Depressuring calculation, PSV & BDV sizing, Control Narrative, ESD Phylosophy, Cause & Effects Matrix, HazOp meeting | |
2015 | SIIRTEC NIGI | ADCO | ONSHORE | EPC FOR AL DABB'IYA PHASE I-II DEVOLPEMENT | 142 MMSCFD TEG circulation: 11 m3/h | PIDs, PFD, Line List, Equipment calculation & Data Sheet, Valves & Instrument Data Sheet, Depressuring calculation, PSV & BDV sizing, Control Narrative, ESD Phylosophy, Cause & Effects Matrix, HazOp meeting | |
2015 | PUMA PROGETTI | SOUND OIL | ONSHORE | Tendrara Gas Treatment Plant. | 53 MMSCFD | Tendara - Morocco | Basic Design and Feed of TEG Dehydration Unit and an Amine Sweetening Unit (CO2 Removal) |
2015 | SIME | MAERSK OIL KAZAKHSTAN | ONSHORE | Dunga Field Development Phase II | 165 m³/h of treated water | Kazakhstan | Basic Design of a Produced Water Treatment Package. |
2015 | SIME | MAERSK OIL KAZAKHSTAN | ONSHORE | Dunga Field Development Phase II | 2.5 ton/h of recovered gas | Kazakhstan | Basic Design of a Vapor Recovery Unit. |
2015 | SIME | ONSHORE | Gas Reinjection Project | 1,230. Kg/h of Fuel Gas | Abu Dhabi - UAE | Basic Design and cost estimation of a Fuel Gas Treatment Skid. | |
2015 | SIME | ENI | REFINERY | Sannazzaro-Ferrera Pipeline Revamping | 700 m³/h | Sannazzaro Refinery - Italy | Process Design and cost estimation of the revamping works and the new custody flow-meter. |
2015 | SIME | ENI | REFINERY | Aircooler performance check | 118. ton/h of gas | Sannazzaro Refinery - Italy | Aircooler Aircooler performance check after tube rupture. Thermodinamic Simulation. |
2015 | SIME | ABB | ONSHORE | Satellite wells Revamping | Hassi Messaoud Sud - Algeria | Simulation by means of Aspne Air-cooled Exchanger (EDR) Thermodinamic Simulation of Aircooler HASSI-MESSAOUD SUD Aircoolers Performances Check | |
2015 | SIME | ENI | REFINERY | Butilene Loading/Unloading system | Sannazzaro Refinery - Italy | Only process Acitivities Basic Engineering for economical evaluation | |
2015 | SIME | ENI | REFINERY | Naphta Splitter Revamping | 15 ton/h of Gasoil | Sannazzaro Refinery - Italy | Process design services during detail enginering Ingegneria di dettaglio riutilizzo Isosiv per tvr benzine Revamping Naphta splitter |
2016 | JACOBS | BIOGEN | ONSHORE | NGM Biogen | - | Solothurn - Switzerland | Technical BID evaluation, P&ID Review, Vendor follow-up, Aspen Flare System-Blowdown network |
2016 | Amec Foster Wheeler | OMV Petrom | REFINERY | Petrobrazi Refinery: Polyfuel | - | Ploiesti - Romania | P&ID Review, Line list, Tie-in List, Fluid List, Equipment List, P&ID Firefighting system, PED Category |
2016 | JACOBS | BIDACHEM | ONSHORE | Power Plant Unit | - | Fornovo S. G. (BG) - Italy | Aspen Flare System-Blowdown network |
2016 | MACH10 | TULLOW | OFFSHORE | 220 MMSCFD | Ghana | ASPEN FLARE SYSTEM, PSV size | |
2016 | FIORENTINI | ITAL GAS STORAGE | ONSHORE | ITAL GAS STORAGE Gas Treatment Plant | 3 x 16,500 kg/h of Lean TEG | Cornegliano Laudense - Italy | Bid Preparation – PFD – H&MB – Equipment Sizing – Line sizing – Utilities Consumption – P&ID Review |
2016 | PROCESS SERVICE | JIANGXI BRO. PHARMA. CO. | PHARMA | Brother Chemical Diphenol Plant | China | Detailed Engineering and suppliers technical follow-up (PFD's, P&ID's, Equipment Data Sheets - Utilities Layout etc.) | |
2016 | AFW | SARLUX | REFINERY | Uility Systems Revamping | 24,700. Nm3/h | Sarroch Refinery - Italy | H2 network revamping, installation of a new chiller. Project engineering services, client and suppliers technical follow-up. |
2017 | JACOBS | CONFIDENTIAL CLIENT | PHARMA | Submarine Project | 116 Batches/year | Canton Vaud, Lausanne, Switzerland | Detailed Engineering and suppliers technical follow-up (PFD's, P&ID's, Equipment Data Sheets - Utilities Layout etc.) |
2017 | JACOBS | BAUSCH & LOMB | PHARMA | Ristrutturazione Aree Solidi e Pesate | Macherio (MB) - Italy | Implementation and Review of: PFD - P&ID. Process Design. Contacts with Suppliers. | |
2017 | PLANTEC | ATS/VENCI | POWER | Revamping of Saint Quen Plant | Paris-France | PFD, P&ID review, analisi funzionali, elenco linee, bilanci di materia | |